1.Factory Layout Drawing
2.Equipment Flow Chart
300-500MW solar panel production line
FACTORY SIZE:6000-10000㎡
POWER REQUEST:1200-2500KW
Q: What terms of payment?A: We accept PayPal, T/T(Bank Transfer). T/T 30% in advance, 70% balance before shipment.
Q: What is the delivery time?A: 30-45 working days after receipt of payment.
Q: How long does the installation and debugging cycle usually take?A: Generally, it takes 45-60 working days.
Q: What about the package?A: All the sheets will be packed by wrapping film and rain cloth, Wooden box packaging requires additional charges.